l
If the Auth LED is always on, it indicates that the ONU registers successfully.
5.
After confirming that the ONU works in the normal state (the Link LED is on and the Auth
LED blinks), the hardware installation engineer records the ONU SN and reports the SN
to the commissioning engineer.
6.
The commissioning engineer maps the ONU SN, the management IP address of the ONU,
and the physical position of the ONU, and binds the IP address and the SN of the ONU
through the NMS.
7.
After being powered on, the ONU registers with the OLT automatically. Then, the OLT
sends the management channel parameters of the ONU (management VLAN, IP address,
and SNMP parameters) to the ONU and also sends the trap message to the NMS for
informing the NMS that an ONU goes online.
8.
The commissioning engineer receives the trap indicating that the ONU goes online reported
by the OLT on the NMS.
After the trap indicating that the ONU goes online is received on the NMS, the ONU
management channel is enabled successfully. Then, you can remotely configure services
for the ONU through the NMS.
Scenario Without the NMS
shows an example network of device deployment in the scenario without the NMS.
Figure 1-2
Example network of device deployment in the scenario without the NMS
Router
OLT
Splitter
ONU_B
ONU_A
ONU_D
ONU_C
PC_B
PC_A
Splitter
MGC
SmartAX MA5616 Multi-service Access Module
Configuration Guide
1 Deploying Network Devices
Issue 04 (2011-10-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5