
Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
167
Rev. 9 (12-2021)
Install an Encoder Assembly - Straight and Curved Sections
Power to the controller and gateways should OFF while installing encoders, and
then turned ON before calibration.
1. If required, remove the old encoder assembly.
Remove an Encoder Assembly - Straight Section
Remove an Encoder Assembly - Curved Sections
2. Connect the RJ11 plug to the new encoder assembly connection.
3. Align the encoder assembly with the locating dowels.
4. To prevent damage to the RJ11 connection, make sure it is aligned with the
RJ11 opening.
5. Press the encoder assembly firmly down onto the locating dowels.
6. Secure the encoder assembly in position with five (5) screws.
7. Install an encoder assembly screw cap over each of the five (5) screws.
8. Remove locks and tags.
9. Turn the
SuperTrak conveyance platform power disconnect switch
to
the ON position.
10. Calibrate the motor with the new encoder assembly.
See the TrakMaster built-in help for the calibration procedure.
11. If the straight section has a pallet setup stationary mount installed, reference
the encoder positions.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...