
104
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Installation
Adjust the Upper V-Rail ±0.05 mm (±0.002 in.) - Straight Section to
Straight Section
1. If vertical upper v-rail adjustment is required, complete the following steps on
the side that requires adjustment:
a. Loosen the four (4) screws at the top of the stand.
b. Loosen the four (4) wedge screws.
c. Turn the height adjustment screw as required to adjust the upper
v-rail height (UP or DOWN).
d. Tighten the four (4) stand screws and four (4) wedge screws that were
loosened in step a and b.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...