
184
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Technician Procedures
•
For the 90 deg.section, the
connection is located on the
right side of the right coil
driver board that is in the left
electrical panel.
6. As applicable, connect the 24 VDC digital power wire (DIG+) to the J17
connector on the gateway board of the curved section:
•
For the 180 deg. (500 mm)
section, the connection is located
on the gateway board inside the
section.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...