164
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Technician Procedures
Install a Gateway Board - 180 Deg. Section (500 mm)
If required, reference
on page 30 during this procedure.
1. Remove the old gateway board:
Remove a Gateway Board - 180 Deg. Section (500 mm)
2. Verify that the gateway board does not contain any white plastic spacers, and
then align the gateway board with the screw holes inside the 180 deg. section.
3. Secure the gateway board in position with four (4) screws.
4. Connect the ground wire.
5. As required, connect one (1) or two (2) motor network connection cables.
6. Connect the two (2) encoder cables (right and left).
7. Connect the four (4) ribbon cables.
8. Connect the two (2) 24V digital power connections.
9. Align the top cover on the 180 deg. section.
10. Install ten (10) screws and ten (10) washers to secure the top cover in
position.
To prevent electrical board damage from electrostatic discharge (ESD),
use an ESD wrist strap when working with the gateway board. An ESD
wrist strap prevents the buildup of static electricity.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...