
160
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Technician Procedures
Remove a Gateway Board - 180 Deg. Section (500 mm)
1. Turn the
SuperTrak conveyance platform power disconnect switch
to
the OFF position.
2. Lock out and tag hazardous energy.
3. Remove ten (10) screws and ten (10)
washers from the top cover of the 180
deg. section, and then lift and remove the
top cover.
4. Disconnect the two (2) 24V digital power
connections.
5. Unplug the four (4) ribbon cables.
To prevent electrical board damage from electrostatic discharge (ESD),
use an ESD wrist strap when working with the gateway board. An ESD
wrist strap prevents the buildup of static electricity.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...