Installation
SuperTrak™ GEN3 System Operation and Maintenance Manual
59
Rev. 9 (12-2021)
16. Install the first curved section.
17. For 180 deg. sections, use shims to verify that a 0.5 mm (0.02 in.) gap exists
between the 180 deg. section and each of the two (2) abutting straight sections
(between the track structure [or aluminum extrusion], not between the linear
motors [or motor laminations]).
For 90 degree sections, use shims to verify that a 0.5 mm (0.02 in.) gap exists
between the 90 deg. section and each of the two (2) abutting sections.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...