Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
227
Rev. 9 (12-2021)
6. On each side of the encoder strip assembly, insert a hex key into the hole and
engage the recessed set screw.
7. Turn the hex key(s) the required amount in the required direction to correctly
adjust the encoder strip assembly. Aim for a pallet position that is within a few
microns; the value on the TrakMaster screen should be green.
It is helpful to loosen one set screw as you tighten the other. Do not over-
tighten these set screws, or the encoder strip assembly may shift out of
position.
8. Tighten the two (2) encoder strip assembly screws from step 5.
9. Verify that the pallet position did not change (see step 4). If the value did
change, repeat steps 4 to 8.
Adjust a Secondary Encoder Strip
This procedure describes how to align the secondary encoder strip with the
primary encoder strip. Complete this procedure if a pallet is causing faults, and the
primary strip alignment has already been verified.
1. Verify that the primary encoder strip is aligned.
Adjust the Pallet Encoder Strip Assembly (Primary Encoder Strip)
2. Remove the pallet from the pallet setup removable locate:
a. Loosen the side thumb screw to release the pallet.
b. Raise the side thumb screw.
c. Slide the pallet to the right.
During this procedure, do not over-tighten the side screws
because it can bend the secondary strip.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...