Technician Procedures
4. Remove fifteen (15) screws from the upper
v-rail, and remove the screws from the
adjacent sections as well.
Replace an Upper V-Rail - Straight
5. Note the position of the 0.25 mm (0.01 in.) shim, and then place the shim in a
safe location.
6. Lifting the section of interest, free
adjacent V-slots between this section
and adjacent sections so that the V-rail is
free to be lifted the rest of the way.
7. Slide the upper v-rail out in the forward direction clear of the motor.
The v-slots at the ends of the upper v-rail prevent it from being lifted straight
up.
8. Clean the top of the section with a soft cloth to remove any debris.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...