Replace an Upper V-Rail
Replace the upper v-rail if it becomes damaged.
Replace an Upper V-Rail - Straight Section
Remove an Upper V-Rail - Straight Section
1. Turn the
SuperTrak conveyance platform power disconnect switch
to
the OFF position.
2. Lock out and tag hazardous energy.
3. Remove the left and right encoder assemblies.
Remove an Encoder Assembly - Straight Section
4. Remove eleven (11) screws from the
upper v-rail.
5. Note the position of the 0.25 mm (0.01 in.) shim, and then place the shim in a
safe location.
6. Slide the upper v-rail out in the forward
direction clear of the motor.
The v-slots at the ends of the upper v-rail
prevent it from being lifted straight up.
7. Clean the top of the straight section with a soft cloth to remove any debris.
Install an Upper V-Rail - Straight Section
1. Hold the new upper v-rail horizontally,
with the counter-bore side up.
2. Slide the new upper v-rail between the
upper v-rails of the adjacent straight
sections.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...