
Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
237
Rev. 9 (12-2021)
9. Verify joint alignment on both ends and adjust if necessary.
10. Calibrate the encoders.
See the TrakMaster built-in help for the calibration procedure.
Install an Upper V-Rail - 180 Deg. Section 180 Deg. (500 mm) Section
1. Hold the new 180 deg. top plate horizontally with the counter-bore side up.
2. Position the top plate down onto the top of
the 180 deg. section.
The top plate must align with features in
the top of the 180 deg. section.
To prevent damage to the RJ11
connections, make sure the cables are
aligned with the RJ11 openings in the top
plate.
3. Install eleven (11) screws to secure the top plate in position.
4. Align the top cover on the 180 deg. section.
5. Install ten (10) screws and ten (10) washers to secure the top cover in
position.
6. Reinstall the left and right encoder assemblies.
7. Verify joint alignment on both ends and adjust if necessary.
8. Calibrate the encoders.
See the TrakMaster built-in help for the calibration procedure.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...