
Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
169
Rev. 9 (12-2021)
6. Pull the old thermistor wire straight out from the thermistor hole.
7. Slide the end of the new thermistor wire into the thermistor hole until you feel
resistance.
The thermistor tapers. During installation, the thick ridge creates a friction fit
against the sides of the thermistor hole.
8. Plug the new thermistor connector into the electrical board.
9. Route the thermistor wire under the electrical board.
10. If required, connect any coil connections that were disconnected in step 4.
Replace the Outer Thermistors in a Straight Section
There are ten (10) thermistors in each straight section: five (5) on the left coil
driver board, and five (5) on the right coil driver board. This section describes how
to replace the the 1st & 10th thermistors
1. Turn the
SuperTrak conveyance platform power disconnect switch
to
the OFF position.
2. Lock out and tag hazardous energy.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...