SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Operating Procedures
Measure the Resistance Between the Ground (Frame)
and the Common Connection
1. Test the resistance as shown below:
2. Look at the value displayed on the multimeter screen and determine if the
resistance is acceptable:
•
Pass - The value is <1
Ω
.
•
Fail - The value is >1
Ω
.
3. Verify that the bonding jumper is correctly installed in the
180 deg. section that contains the control panel electrical interconnect.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...