
Installation
SuperTrak™ GEN3 System Operation and Maintenance Manual
83
Rev. 9 (12-2021)
b. Loosely install eight (8) screws
into the stand bases.
c. Position a dowel pin between each
straight section stand and the
cross-brace dowel pins.
d. Push the straight section toward
the center of the frame, so it is
tight against the dowel pins.
3. Repeat step 2 for the second straight section.
4. Check the alignment of the two (2)
straight sections, by holding a square tight
against the ends of the two (2) straight
sections.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...