
178
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Technician Procedures
3. Tighten the two (2) strain relief connectors.
4. Feed the required wiring through the metal conduit and connect as required,
then replace the sections’ electrical doors and/or top covers.
See
Straight Section - Left Coil Driver Board
on page 32, and
on page 34 for connection information.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...