
68
SuperTrak™ GEN3 System Operation and Maintenance Manual
Rev. 9 (12-2021)
Installation
7. Adjust the position of all sections until a 0.5 mm (0.02 in.) gap exists between
all sections (between the track structure [or aluminum extrusion], not between
the linear motors [or motor laminations]).
8. Install the wedge adjust for the 180 deg. sections.
Place the precision level on the t-slot behind the encoder assembly of the
straight section when leveling.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...