
Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
161
Rev. 9 (12-2021)
6. Unplug the two (2) encoder cables (right
and left).
7. As required, unplug one (1) or two (2)
motor network connection cables.
8. Disconnect the ground wire.
9. Remove the four (4) connection screws.
10. Remove the gateway board.
11. If the gateway board is being returned for repair, remove the hardware
(screws, washers, and spacers), and make sure the gateway board is packaged
in an ESD safe bag.
Summary of Contents for SuperTrak GEN3
Page 1: ...Rev 9 December 2021...
Page 2: ......
Page 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Page 6: ......
Page 12: ...This page is intentionally blank...
Page 30: ...This page is intentionally blank...
Page 58: ...This page is intentionally blank...
Page 296: ...This page is intentionally blank...
Page 300: ...This page is intentionally blank...
Page 364: ...This page is intentionally blank...
Page 366: ...This page is intentionally blank...