6-23
Valco Cincinnati, Inc.
MC060 Manual/VC350AG AutoGlue Control System
Section 6 - Installation
The JP2000 shuts down the parent machine if jammed product flow is
detected. For information about how to operate the JP2000 jam preventer,
see the
JP2000 Jam Preventer Installation and Operation Manual, PN
MC006. To install the JP2000 jam preventer, follow these steps:
1.
Mount the jam sensors on the parent machine.
2.
Connect the jam sensors to the JP2000 as described in the
JP2000 Jam Preventer Installation and Operation Manual, PN
MC006.
3.
Connect the VC350AG control to the JP2000 using the diagram
below (Figure 6-17).
4.
Connections are made to interface board J7 as shown.
5.
Make all other connections per the
JP2000 Jam Preventer
Installation and Operation Manual, PN MC006.
A JP2000 operates at 100 pulses per
inch. Therefore, a VDD-1000 encoder
(1000-line encoder) needs to be
operating with the VC350AG control.
Installing the
JP2000 Jam
Preventer
Summary of Contents for VC350A
Page 1: ...VC350A Flexoseal System Manual Number MC037 Release Date May 2001 ...
Page 8: ...Section 1 Introduction VC350A Flexoseal System Valco Cincinnati 1 2 Figure 1 1 VC350A Control ...
Page 68: ...Section 9 Maintenance VC350A Flexoseal System Valco Cincinnati 9 9 Figure 9 4 Fluid Regulator ...
Page 133: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 44 400EZ Glue Valve ...
Page 163: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 74 Fittings ...