Appendix D
—
Maintenance Procedures
VC350A Flexoseal
®
System
Valco Cincinnati
D-3
3-Month Maintenance
Actions
Date
Shift
Initials
1. Encoder mounting:
a. Check timing belt, gear and pulley teeth, and proper
timing belt tension..
b. If using measuring wheel, check for wear and
proper wheel tension on machine belt.
c. If using direct-drive encoder, check coupling and
rotation of shaft for proper alignment.
2. Perform the
“Weekly Maintenance” procedure.