Valco Cincinnati
7-1
Introduction
This section contains information about how to perform initial setup of the VC350A Flexoseal
®
system.
Glue Delivery System
To set up the glue delivery system, follow these steps:
1. Stop the parent machine.
2. With the supply hose removed from the glue valve, run adhesive through the system until no air is present
in the glue line.
Note!
A smooth flow of glue should exit the shutoff valve for one minute.
3. To remove any trapped air in the fluid regulator, turn the “T” handle completely clockwise.
4. Turn the “T” handle completely counterclockwise.
5. Repeat steps 3 and 4 twice.
6. Set the fluid regulator to 10 psi (1.7 bar) for contact applications or to 20 psi (2.4 bar) for non-contact
applications.
7. Install the glue hose with shutoff valve onto the glue valve.
Air Pressure Settings
Table 7-1. Air Pressure Settings—Minimum Input Pressure at Machine Idle
Section 7—Initial Setup
Component
Contact Extrusion
Non-Contact Extrusion
Pressurized tank
60 psi / 5.1 bar
70-120 psi / 5.8-9.2 bar
DD-1 pump
80 psi / 6.5 bar
80 psi / 6.5 bar
2:1 ratio pump
80 psi / 6.5 bar
80 psi / 6.5 bar
5:1 ratio pump
40 psi / 3.7 bar
40 psi / 3.7 bar
Fluid flow control (EPC)
80 psi / 6.5 bar
60-80 psi / 5.1-6.5 bar
Glue valves
80 psi / 6.5 bar
Not applicable
Note!
For pumping systems that include piston pumps (2:1 or 5:1), be sure to add lubricant to air line oiler and
pump-packing pump if needed.
Summary of Contents for VC350A
Page 1: ...VC350A Flexoseal System Manual Number MC037 Release Date May 2001 ...
Page 8: ...Section 1 Introduction VC350A Flexoseal System Valco Cincinnati 1 2 Figure 1 1 VC350A Control ...
Page 68: ...Section 9 Maintenance VC350A Flexoseal System Valco Cincinnati 9 9 Figure 9 4 Fluid Regulator ...
Page 133: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 44 400EZ Glue Valve ...
Page 163: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 74 Fittings ...