Section 6
—
Installation
VC350A Flexoseal
®
System
Valco Cincinnati
6-22
Installing the Air Supply
The plant air system must supply at least 80 psi (6.5 bar) of clean, dry air to the Flexoseal
®
system. It may be
necessary to install low-pilot inlet glue valves in place of standard glue valves if 80 psi (6.5 bar) air is not available.
To connect the air supply, follow these steps:
1. Install plant air to the parent machine with a shutoff valve at the end of the line.
2. Mount the applicator air-pressure regulator in a convenient place near the shutoff valve.
3
.
Using 3/8" tubing, connect the regulator to the applicator air solenoid and the “AIR IN” port of the control
(Figure 6-24).
4. Using 1/4" tubing, connect the fluid pressure regulator to the “PRESSURE OUT” port
of the control.
5. Connect the output of the glue regulator to the glue valve.
Note!
Maximum pressure in = 100 psi. Pressures above 100 psi can cause damage to the pressure trans-
ducer.
Figure 6-24. Bottom View of VC350A Control
“AIR IN” port
“PRESSURE
OUT” port
Summary of Contents for VC350A
Page 1: ...VC350A Flexoseal System Manual Number MC037 Release Date May 2001 ...
Page 8: ...Section 1 Introduction VC350A Flexoseal System Valco Cincinnati 1 2 Figure 1 1 VC350A Control ...
Page 68: ...Section 9 Maintenance VC350A Flexoseal System Valco Cincinnati 9 9 Figure 9 4 Fluid Regulator ...
Page 133: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 44 400EZ Glue Valve ...
Page 163: ...Section 12 Part Number List VC350A Flexoseal System Valco Cincinnati 12 74 Fittings ...