OPERATING INSTRUCTIONS
AGT 1060
Rev.09/2020
45
Fig. 44
The lower link arms can be connected in two different ways, which are further divided into
several options:
•
Ball link connection
can be made when the ball has a standard bore, which is used to
insert the connection bolt installed on the implement to be attached to the tractor.
•
Ball connection (optional)
can be made when the balls with equally standard bores have
been previously inserted on the connection bolts of the machine to be attached to the
tractor. The ends of lower link arms of the three-point linkage system are fitted with a
hook with a hole for the ball installed on the tractor. The attachment is made by lifting
the lower link arms while precisely positioning the tractor next to the implement.
The top link can be connected in two different ways:
•
mechanically adjustable with a ball link (standard) into which a bolt is inserted or
•
hydraulic connection with a ball connection or link (optional).
Due to different sizes of tractors and implements, the three-point linkage is divided in three
categories, as standard:
Three-point linkage categories
Connection points on the tractor –
bore diameter for the connection pin
Lower link arm
Top link
d4
d2
Category I
22.4
19
Category II
28.7
25.5
Category III
37.4
31.7
Summary of Contents for AGT 106
Page 202: ...OPERATING INSTRUCTIONS AGT 1060 Rev 09 2020 201 Rear left side view of the tractor Fig 237...
Page 240: ...OPERATING INSTRUCTIONS AGT 1060 Rev 09 2020 239 Fig 252 9 11 2 WIRING DIAGRAM OF THE ENGINE...
Page 241: ...OPERATING INSTRUCTIONS AGT 1060 Rev 09 2020 240 Fig 253 9 11 3 WIRING DIAGRAM OF THE DASHBOARD...
Page 242: ...OPERATING INSTRUCTIONS AGT 1060 Rev 09 2020 241 Fig 254 9 11 4 WIRING DIAGRAM OF THE CAB...
Page 244: ...OPERATING INSTRUCTIONS AGT 1060 Rev 09 2020 243 NOTES...