NetCol8000-C(070-260) In-room Chilled Water Smart
Cooling Product
User Manual
3 Installation Guide
Issue 06 (2020-01-13)
Copyright © Huawei Technologies Co., Ltd.
93
Figure 3-64
Side cabling for downflow units with dual power supplies
Step 3
A ground cable must be routed from the equipotential bonding point of the cabinet to the
ground. The following figure shows the equipotential bonding point of the cabinet.