NetCol8000-C(070-260) In-room Chilled Water Smart
Cooling Product
User Manual
3 Installation Guide
Issue 06 (2020-01-13)
Copyright © Huawei Technologies Co., Ltd.
84
Figure 3-54
External ports of the electric control box
(1) PSU
(2) Main control module
(3) Electric heater switch QF3
(4) Fan switch QF4
3.6.3 Connecting Power Cables
Context
The device must be grounded as required by local electrical specifications.
Cables must be routed in through cable clips.
Route and bind the cables along the beams or columns of the unit.
The cabinet has no input neutral wire. You can cut the blue neutral wire and wrap it using
insulation tape.
Cables can be routed from the bottom or side of the upflow units and cables can be
routed from the bottom, side, or top of the downflow units. Knock off the padding of
holes at the proper positions based on the onsite cable routing method, and route the
cables through the holes.
Procedure
Step 1
Connect wiring terminals of the L1, L2, and L3 wire of the input power cable respectively to
the corresponding terminals of the external power cable.