NetCol8000-C(070-260) In-room Chilled Water Smart
Cooling Product
User Manual
3 Installation Guide
Issue 06 (2020-01-13)
Copyright © Huawei Technologies Co., Ltd.
100
Figure 3-72
Sequence of the network cable
3.6.5.3 Connecting the Monitoring Network Cable
Connecting the FE Monitoring Network Cable (SNMP/Modbus-TCP)
Step 1
Connect one end of the monitoring network cable to the FE port on the smart cooling product
LCD, and connect the other end to the monitoring device, as shown in
Figure 3-73
Connecting the FE monitoring network cable
----End
Connecting the RS485 Monitoring Network Cable (Modbus-RTU)
When monitoring smart cooling products over northbound RS485, the EMS needs 3 seconds
to collect data from one smart cooling product. Therefore, the time required for collecting
data from N smart cooling products in a group is 3 x N. If the data collection time is longer
than the performance requirement, you can divide the smart cooling products into several
groups. For example, if the EMS needs to finish data collection in 12 seconds, you are advised