![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970097.webp)
UNIVERGE SV9100
Issue 1.2
System Hardware Manual
3 - 25
9.
The cable support bracket can be installed any of the four corners of
the 19” chassis.
10.
Connect the ground wire to all chassis. Refer to
1.1.3 Install
Grounding on 19” Chassis on page 3-13
for complete details on
grounding the system.
11.
Refer to
1.1.5 Install AC Power Cords on 19” Chassis on page 3-15
to
continue installation of the chassis or, Chapter 6 paragraph
2.1
Installation and Safety Precautions on page 4-3
for installation of
blades.
2.2
Wall Mounting the 9.5” Chassis
When wall mounting the chassis, ensure the wall can support the weight of the
chassis and cards (25 lbs per system chassis ---- including blades, cords, power
supply, etc.). The chassis is secured to the wall with a wall mount bracket.
m
To wall mount the CHS2UG with the external battery installed, refer to
2.2.2.2
Wall Mounting the CHS2UG with the CHS2UG B Small Batt Box on page
3-31
.
2.2.1
Option 1 – Wall Mounting the 9.5 inch
(
CHS2UG
)
Chassis
Figure 3-34 Attachment Locations of Cable Support Bracket
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...