![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970112.webp)
Issue 1.2
UNIVERGE SV9100
3 - 40
Installing the SV9100 Chassis
1.
Install the five rubber feet to the bottom of each chassis.
2.
Using supplied screws in the CHS2UG JOINT BRACKET KIT, attach
metal brackets to both ends of the 19” chassis and the CHS BASE
UNIT. Refer to figure below.
3.
Connect the ground wire to all chassis. Refer to
1.1.3 Install
Grounding on 19” Chassis on page 3-13
for complete details on
grounding the system.
4.
Refer to
1.1.5 Install AC Power Cords on 19” Chassis on page 3-15
to
Figure 3-51 Install Rubber Feet for Multiple Chassis
Figure 3-52 Install Metal Brackets with Screws
Metal
Brackets
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...