UNIVERGE SV9100
Issue 1.2
System Hardware Manual
3 - 79
6.
Reconnect AC power cable to rear of 9.5” chassis.
7.
To power on the 9.5” chassis, refer to Chapter 4,
2.6 Powering Up the
SV9100 on page 4-9
.
6.4.3
CHS LARGE BATT BOX Fuse Replacement
To replace the fuse(s) in the CHS LARGE BATT BOX, refer to Chapter 3,
section
6.2.4 CHS LARGE BATT BOX Fuse Replacement on page 3-67
.
S
ECTION
7
P
OWER
S
UPPLY
S
ECTION
8
R
EMOVE
AND
I
NSTALL
C
OOLING
F
AN
If required, the cooling fan installed in the CHS2UG chassis can be removed and
replaced. Follow the procedure below for the CHS2UG chassis.
8.1
CHS2UG Chassis
Figure 3-111 CHSG LARGE BATT BOX to CHS2UG Connection
Do not attempt to replace the power supply on the CHS2UG chassis. The
MPS7101 is not a field replaceable part. If the power supply fails, contact
NEC.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...