UNIVERGE SV9100
Issue 1.2
System Hardware Manual
3 - 5
1.1.2.1
Connector Pin-Out on the GPZ-BS10/GPZ-BS11
1.1.2.2
Install the GPZ-BS10 Expansion Base Blade in the
CHS2UG Controlling Chassis
1.
Ensure the chassis is powered down.
2.
Locate the door positioned on the left end (expansion bay) of
the Controlling Chassis (refer to
Figure 3-7 GPZ-BS10
Expansion Bay in Controlling Chassis on page 3-6
).
Table 3-1 GPZ-BS10/GPZ-BS11 Connector Pin-Out
RJ-61 Cable Connector
GPZ-BS10
– CN2, CN3, CN 4
GPZ-BS11 – CN3
Pin No.
Connection
1
HW_UP (+)
2
HW_UP (-)
3
HW_DWN (+)
4
FS (+)
5
FS (-)
6
HW_DWN (-)
7
CK8M (+)
8
CK8M (-)
Figure 3-6 GPZ-BS10 Components
Do not remove or install this blade with the
power on.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...