![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970420.webp)
Issue 1.2
UNIVERGE SV9100
6 - 8
Installing SV9100 Optional Equipment
9.
Install a modular jack for each PGD(2)-U10 ADP. For each module, run
one-pair 24 AWG station cable from the cross-connect block to a
modular jack. Ground the unused pair.
10. Terminate the extension leads to GRN/RED of the modular jack.
Terminate the unused leads to the jack.
11.
Install bridging clips as required.
.
For the module to ID correctly, set the circuit type to 0 for the port in Program
10-03-01 prior to connecting the line cord.
12. Plug a modular line cord from the mod jack to the CN1 connector on the
PGD(2)-U10 ADP.
13.
Optional:
To wall mount the PGD(2)-U10 ADP, insert two wood screws 100mm
apart (3 15/16”). Leave 3mm (1/8”) of the screw exposed. The screws
can be installed either vertical or horizontal, depending on which position
Figure 6-7 PGD(2)-U10 ADP Connections
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...