1.
Use the template shown in below for required spacing before drilling
holes for 0.39” (10mm) anchor bolts (locally procured).
2.
Mark and drill the four holes required to install the CHS BASE UNIT.
m
Because of injury from falling equipment, wall mounting
the CHSG LARGE BATT BOX is not recommended.
m
Mounting the CHSG LARGE BATT BOX directly on the
floor is not recommended.
m
The CHS BASE UNIT raises the height of the CHSG
LARGE BATT BOX 120mm (4.72”).
m
When the CHSG LARGE BATT BOX and CHS2UG are
connected for long term use, the CHS2UG JOINT
BRACKET KIT is used.
Figure 3-78 Floor Mount Spacing Guide
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...