9.
Insert tabs on cover into holes on CHS LARGE BATT BOX. Slide the
cover left until seated and tighten the screw.
6.3
Installing the CHSGW SMALL BATT BOX on the 9.5” Chassis
An optional, CHSGW SMALL BATT BOX can be installed to provide external
battery power to the CHS2UG chassis during a power failure. The short-term
battery box will power the system for approximately 10 minutes.
6.3.1
CHSGW SMALL BATT BOX Installation
1.
Power down the CHS2UG chassis.
2.
Disconnect AC power cable from rear of chassis.
3.
Align the Small Battery cable assembly with the grooves underneath
the Base (CHS2UG) chassis. Use the two M3 x 8 screws provided to
secure the cable assembly in place (refer to
Figure 3-99 Installing
Battery Cable Assembly on page 3-71
).
Figure 3-98 Installing Cover Battery
Ensure the CHS2UG chassis is powered OFF.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...