Issue 1.2
UNIVERGE SV9100
2 - 28
SV9100 System Specifications
GPZ-4COTE
3.53 oz
(0.10 kg)
1.89 in
(48 mm)
9.45 in
(240 mm)
5.12 in
(130 mm)
GCD-4LCA
5.99 oz
(0.17 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GPZ-4LCA
3.10 oz
(0.09 kg)
0.60 in
(15 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GCD-8LCA
6.46 oz
(0.183 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GPZ-8LCE
3.70 oz
(0.105 kg)
0.60 in
(15 mm)
9.45 in
(240 mm)
5.12 in
(130 mm)
GCD-2BRIA
5.99 oz
(0.17 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GPZ-2BRIA
4.02 oz
(0.114 kg)
0.60 in
(15 mm)
4.72 in
(120 mm)
7.68 in
(195 mm)
GCD-PRTA
5.5 oz
(0.156 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
3.94 in
(100 mm)
GCD-CCTA
5.5 oz
(0.156 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GCD-4ODTA
8.25 oz
(0.234 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GCD-RGA
10.05 oz
(0.285 kg)
0.98 in
(25 mm)
5.71 in
(145 mm)
7.68 in
(195 mm)
GCD-VM00
7.76 oz
(0.22 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GCD-PVAA
10.05 oz
(0.285 kg)
0.98 in
(25 mm)
5.71 in
(145 mm)
7.68 in
(195 mm)
GCD-ETIA
12.17 oz
(0.345 kg)
0.98 in
(25 mm)
5.71 in
(145 mm)
7.68 in
(195 mm)
GCD-4DIOPB
7.73 oz
(0.219 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
GCD-SVR2
9.8 oz
(0.278 kg)
0.98 in
(25 mm)
9.45 in
(240 mm)
7.68 in
(195 mm)
CHS BASE UNIT
21.87 oz
(0.62 kg)
23.23 in
(590 mm)
17.72 in
(450 mm)
10.43 in
(265 mm)
CHS2UG BLANK SLOT COVER KIT
1.76 oz
(0.05 kg)
2.32 in
(60 mm)
1.57 in
(40 mm)
1.57 in
(40 mm)
CHS L BATT BOX RACK MOUNT BRACKET
352.7 oz
(10 kg)
18.5 in
(470 mm)
14.6 in
(370 mm)
2.76 in
(70 mm)
Table 2-19 SV9100 Weights and Dimensions (Continued)
Unit
Shipping
Weight
1
Height
Width
Depth
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...