![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970414.webp)
Issue 1.2
UNIVERGE SV9100
6 - 2
Installing SV9100 Optional Equipment
The PGD(2)-U10 ADP connects to any available digital extension port. The
terminal connections made within the PGD(2)-U10 ADP and the jumper
settings determine what features are used for each circuit.
2.2
LED Indications
2.3
Setting up PGD(2)-U10 ADP Connections
If the PGD(2)-U10 ADP is to be wall mounted, all the cable connections
should be made first.
For the module to ID correctly after setting the jumpers, set the circuit type
to 0 for the module port in Program 10-03-01 prior to connecting the line
cord to the PGD(2)-U10 ADP.
Figure 6-1 PGD(2)-U10 ADP
Table 6-1 PGD(2)-U10 ADP LED Indications
LED
Indication
Note
LED 1
Green LED when
CH1 in use.
Flashing green LED indicates dipswitch setting
and programming for CH1 is conflicting.
LED 2
Green LED when
CH2 in use.
Flashing green LED indicates dipswitch setting
and programming for CH2 is conflicting.
Channel 2
Status LED
Channel 1
Status LED
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...