![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970005.webp)
UNIVERGE SV9100
Issue 1.2
System Hardware Manual
- iii
___________________________________________________________________________________
___________________________________________________________________________________
System Hardware Manual
iii
___________________________________________________________________________________
1.1.2.4
Connect the Controlling and Expansion Chassis ...............3-11
1.1.3 Install Grounding on 19” Chassis .............................................3-13
1.1.4 Install Grounding on Multiple 19” Chassis (Optional) ...............3-14
1.1.5 Install AC Power Cords on 19” Chassis ...................................3-15
1.1.6 Install AC Power Cords on Multiple 19” Chassis (Optional) .....3-16
1.1.7 Install Additional Blades 19” Chassis .......................................3-16
1.1.8 Apply Power to the 19” Chassis ...............................................3-16
1.2
Installing the 9.5” Base (CHS2UG) Chassis .............................. 3-16
1.2.1 Install Grounding on 9.5” Chassis ............................................3-17
1.2.2 Install AC Power Cord 9.5” Gateway or Base Chassis ............3-18
1.2.3 Install Additional Blades 9.5” Gateway or Base Chassis .........3-18
1.2.4 Apply Power to the 9.5” Gateway or Base Chassis .................3-18
1.3
Installing the 9.5” Chassis ......................................................... 3-18
Section 2 Wall Mounting the Chassis .......................................................3-18
2.1
Wall Mounting the 19” (CHS2UG) Chassis ............................... 3-18
2.1.1 CHS2UG Chassis Wall Mount Installation ...............................3-18
2.2
Wall Mounting the 9.5” Chassis ................................................. 3-25
2.2.1 Option 1 – Wall Mounting the 9.5 inch (CHS2UG) Chassis .....3-25
2.2.2 Wall Mounting the 9.5 inch (CHS2UG) Chassis ......................3-27
2.2.2.1
Wall Mounting the CHS2UG without the CHS2UG B Small Batt
Box 3-29
2.2.2.2
Wall Mounting the CHS2UG with the CHS2UG B Small Batt Box
3-31
Section 3 Floor Mounting the Chassis .....................................................3-36
3.1
Floor Mounting the 19” (CHS2UG) Chassis .............................. 3-36
3.1.1 CHS2UG Chassis Installation ..................................................3-36
3.1.2 Multiple CHS2UG Chassis Installation .....................................3-39
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...