Issue 1.2
UNIVERGE SV9100
3 - 36
Installing the SV9100 Chassis
6.
Align the upper and lower bracket holes with the heads of
anchor bolts mounted on the wall and slide downward.
7.
Connect grounding wire to chassis. Refer to Chapter 4
paragraph
1.3 Installing the 9.5” Chassis on page 3-18
for
complete details on grounding the system.
8.
Refer for installation of the power cord to Chapter 6
paragraph
2.1 Installation and Safety Precautions on page
4-3
for installation of blades.
S
ECTION
3
F
LOOR
M
OUNTING
THE
C
HASSIS
3.1
Floor Mounting the 19” (CHS2UG) Chassis
The CHS2UG controlling and expansion chassis can be mounted on the floor
using the CHS BASE UNIT and the CHS2UG JOINT BRACKET KIT.
3.1.1
CHS2UG Chassis Installation
1.
Use the template shown in below for required spacing before drilling
Figure 3-46 Wall Mount – Lower Side (Small Batt Box)
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...