![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970222.webp)
Issue 1.2
UNIVERGE SV9100
4 - 68
Installing the SV9100 Blades
2.
Before proceeding to Step 3, wait to verify that the STATUS
LED starts to flash.
3.
Connect the cable from the NT1 Network Termination cable to
the CN7 or CN8 connector on the GCD-2BRIA and/or
PZ-2BRIA daughter board.
5.4.3
Connectors
Table 4-35 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
show
the pin-outs for the RJ-45 cable connector for S-Bus and T-Bus
connections. Refer to
Figure 4-17 Installing the PZ-2BRIA Daughter
Board on page 4-66
for an illustration showing the location of the
connectors on the PZ-2BRIA daughter board.
Table 4-35 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
RJ-45 Cable Connector – CN2
S-Bus Connection
Pin No.
Connection
1
—
2
—
3
RA
4
TA
5
TB
6
RB
7
—
8
—
With normal operation, the status LED
flashes fast. If trouble was found during
the self diagnostics routine, the status
LED flashes slow.
Once connected, the PKG LED will not
be indicated for the status of Layer 1 link.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...