Installing the SV9100 Chassis
The GPZ-BS10 connects the Controlling Chassis to the Expansion Chassis
by connecting to a GPZ-BS11, which is installed on each Expansion
Chassis. These Expansion Interface Units allow the CPU to transmit/receive
data as required to the additional chassis.
The GPZ-BS10 is installed in the Expansion bay Controlling Chassis which
is equipped with a CPU blade. The GPZ-BS11 is installed in the Expansion
bay of the Expansion Chassis, which does not have a CPU.
The Expansion cable connects the Controlling Chassis and its GPZ-BS10
interface to the second, third, and fourth GPZ-BS11 interface.
Use only the CAT 5 cables provided by NEC to make the connections
between the Controlling and Expansion Chassis.
The GPZ-BS10 provides:
p
Communication Processor Interface for data handling through
Communication Channel
(24
slots maximum)
p
64 Channels for Telephony Resource (e.g., DTMF Tone Receiver, Call
Progress Tone Detector, MFC Tone Receiver, Caller ID Receiver,
Caller ID Signal Sender)
p
DSP Resource Management
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...