![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970118.webp)
Issue 1.2
UNIVERGE SV9100
3 - 46
Installing the SV9100 Chassis
4.
Using supplied screws, secure the CHS2UG STAND KIT (K) to the
floor.
5.
Connect the ground wire to all chassis. Refer to
1.1.3 Install
Grounding on 19” Chassis on page 3-13
for complete details on
grounding the system.
6.
Refer to
1.1.5 Install AC Power Cords on 19” Chassis on page 3-15
to
continue installation of the chassis or, Chapter 6 paragraph
2.1
Installation and Safety Precautions on page 4-3
for installation of
blades.
4.2
Stand Mounting the 9.5” CHS2UG B Chassis
Figure 3-58 Install Additional Brackets from CHS2UG JOINT BRACKET KIT
To prevent possible damage to the 19” chassis due to
falling, NEC recommends screws be installed in the
stand mount brackets as soon as possible.
Metal
Brackets
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...