![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970074.webp)
Issue 1.2
UNIVERGE SV9100
3 - 2
Installing the SV9100 Chassis
1.1.1
Installing the 19” Controlling Chassis
1.
Ensure the chassis is powered down.
2.
Align the GCD-CP10 blade with the Slot 1 guides of the Controlling
Figure 3-1 CHS2UG Chassis (Front View)
Figure 3-2 CHS2UG Chassis (Rear View)
Do not remove or install blades with the power on.
Universal Slot for Legacy Line/Trunk blades and
Application blades (six slots). When used as
controlling chassis, the GCD-CP10 is mounted in Slot
1 (shown).
Slot for GPZ-BS10/GPZ-BS11 blade
– Connection with CHS2UG chassis
Power Switch
Fan Unit
(inside of cover)
Internal Battery Mount
Battery Connector
(inside of cover)
AC Connector
Frame Ground
(FG) Terminal
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...