UNIVERGE SV9100
Issue 1.2
System Hardware Manual
5 - 81
9.
Align the projections on the bottom of the 8LKD
(LD)-L UNIT into the guide holes on top of the
multiline terminal.
10. Slide the 8LKD (LD)-L UNIT toward the keypad
buttons until snug (refer to
Figure 5-80 8LKD (LD)-L
UNIT Installed
).
Figure 5-79 Ribbon Cable Installed
Figure 5-80 8LKD (LD)-L UNIT
Installed
Projection
(One Each Side)
Guide
Guide
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...