3.
Repeat for additional Expansion Chassis.
1.1.3
Install Grounding on 19” Chassis
From the factory, the SG, ETH and PBXG grounds are located inside the
chassis and are connected to the FG ground (frame ground) on the back of
the chassis.
Each chassis (CHS2UG) in the system must be grounded separately using
the procedure listed below.
1.
Ensure each Chassis is powered down and unplugged.
2.
Ground
each
chassis by connecting a 14 AWG wire from the FG lug
on the back side of the chassis to an electrical service ground (such as
Figure 3-21 System Expansion Cabling
Install in Controlling
Chassis
Install in Expansion
Chassis
Install in Expansion
Chassis
Install in Expansion
Chassis
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...