UNIVERGE SV9100
Issue 1.2
System Hardware Manual
3 - 41
continue installation of the chassis or, Chapter 6 paragraph
2.1
Installation and Safety Precautions on page 4-3
for installation of
blades.
S
ECTION
4
S
TAND
M
OUNTING
THE
C
HASSIS
4.1
Stand Mounting the 19” (CHS2UG) Chassis
A single or multiple chassis can be stand mounted. Controlling and Expansion
chassis can be stand mounted using the CHS2UG STAND KIT (K) and CHS2UG
STAND KIT (EXT).
4.1.1
CHS2UG Chassis Installation
1.
Using the supplied screws, assemble the CHS2UG STAND KIT (K)
and CHS2UG STAND KIT (EXT) (refer to figure below).
2.
Secure the CHS2UG chassis to the assembled CHS2UG STAND KIT
(K), see figure below.
Figure 3-53 Assemble Stand Mount with Screws
Expansion
Plate
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...