UNIVERGE SV9100
Issue 1.2
System Hardware Manual
3 - 31
4.
Align the upper and lower bracket holes with the heads of
anchor bolts mounted on the wall and slide downward
(refer to
Figure 3-40 Install Screws (Option 2)
).
5.
Connect grounding wire to chassis. Refer to Chapter 4 paragraph
1.3
Installing the 9.5” Chassis on page 3-18
for complete details on
grounding the system.
6.
Refer to
2.1 Installation and Safety Precautions on page 4-3
for
installation of blades.
2.2.2.2
Wall Mounting the CHS2UG with the CHS2UG B Small Batt
Box
To install the CHSGW SMALL BATT BOX refer to section
6.3
Installing the CHSGW SMALL BATT BOX on the 9.5” Chassis
on page 3-70
1.
Align the bracket halves (refer to
Figure 3-37 Wall
Figure 3-40 Install Screws (Option 2)
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...