![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970429.webp)
UNIVERGE SV9100
Issue 1.2
System Hardware Manual
6 - 17
S
ECTION
6
E
XTERNAL
P
AGING
AND
D
OOR
B
OX
/P
AGE
R
ELAYS
6.1
External Page Relays
Two external dry contact relays are available when a PGD(2)-U10 ADP is
installed which can be used to activate ancillary devices (i.e. door unlock
devices). The GCD-CP10 also provides one relay. The GCD-CP10 relay is
defined as a general purpose relay in programming (Program 10-21-01 = 3).
The GCD-CP10 relay 0 is assigned to the door box extension port in
Program10-05-01. When the relay on the PGD(2)-U10 ADP is used, there is
no need to assign the relay to the Door Box – simply connect the relay as
detailed in the steps below for the Door Box used. The relays on the PGD(2)-
U10 ADPs are numbered 5-8. Each Door Box/external page circuit provides a
dry relay contact.
Program Note:
Program 10-21-01 sets the relay switch on the GCD-CP10. If
set to 2 (External Speaker), service code 703+1 pages and the relay closes.
The relay reopens upon hang up. If set to 3 (General Purpose Relay), service
code 880+0 toggles the relay open or closed.
The service codes indicated are the default codes. Refer to Program
11-12-20 and 11-12-50 to redefine these codes as needed.
The PGD(2)-U10 ADP provides amplifiers for each
page output port (for a maximum of +8 dBM, 600
ohms at 1KHz). No additional page amplification is
provided by the PGD(2)-U10 ADP but, if required,
an external page amplifier can be used for additional
amplification.
The page output of the GCD-CP10 does not provide
amplification (for a maximum output of -3 dBm, 600
ohms at 1KHz). If the paging volume is not
satisfactory using the CN8 or CN9 connector on the
GCD-CP10, the PGD(2)-U10 ADP should be used
instead.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...