Issue 1.2
UNIVERGE SV9100
4 - 20
Installing the SV9100 Blades
Call Control Server
Conference Bridge Server
Voice Mail Server (voice mail requires a compact flash card)
SIP Server
RTP Forwarding
VoCoder Conversion
3.1.2
Installation
Each SV9100 system
must have the
GCD-CP10
installed in Slot 1
of the Controlling Chassis.
1.
Install the battery on the GCD-CP10. The polarity “+” symbol
must be on top as illustrated in
Figure 4-5 GCD-CP10 Battery
Installation
.
Figure 4-5 GCD-CP10 Battery Installation
The chassis power must be off when installing or
removing the GCD-CP10.
After removing a previously installed
GCD-CP10, handle the blade, carefully, from the
edges. If certain solder points/resistors are
touched on the back of the blade, some RAM/
temporary memory may be lost (e.g., time, date,
user-defined settings, etc.)
IMPORTANT INSTALLATION NOTES
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...