Issue 1.2
UNIVERGE SV9100
4 - 78
Installing the SV9100 Blades
5.6.4
Connectors
Table 4-42 GCD-PRTA RJ-45 Cable Connector Pin-Outs
shows the
pin-outs for the RJ-45 connector. Refer to
Figure 4-19 GCD-PRTA
Blade (Front and Side View) on page 4-73
for an illustration showing
the location of the connectors on the PRIU blade.
Note:
The order of priority is set up to alarm in the order
LOS>AIS>OOF>RAI.
Table 4-42 GCD-PRTA RJ-45 Cable Connector Pin-Outs
RJ-45 Cable Connector
S-Bus Connection
Pin No.
Connection
1
RB
2
RA
3
—
4
TB
5
TA
6
—
7
—
8
—
RJ-45 Cable Connector – CN2
T-Bus Connection
Pin No.
Connection
1
RA
2
RB
3
—
4
TA
5
TB
6
—
7
—
8
—
Table 4-41 ISDN LED Indications
Alarm
Details of the Alarm
LED Indication Pattern
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...