![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970385.webp)
UNIVERGE SV9100
Issue 1.2
System Hardware Manual
5 - 125
9.2
Wall-Mounting the SLT Adapter
1.
Unplug the two line cords from the SLT Adapter.
2.
Remove the two screws from the front of the SLT Adapter.
3.
Lift the cover off the adapter.
Figure 5-147 Connecting the SLT Adapter
Figure 5-148 Removing the Cover
3
4
Modular Terminal Connections
Single Line Telephone Connections
SLTII(1)-U( ) ADP
GN
RD
Y
BL
T
R
ESI Port
Base
Cord
Modular Terminal
3
4
Modular Terminal Connections
To ESIU
GN
RD
Y
BL
ESI Port
Base
Cord
Modular Terminal
ESIU Port
ESIU
GCD-8DLCA or
GCD-16DLCA
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...