UNIVERGE SV9100
Issue 1.2
System Hardware Manual
4 - 5
2.2.2
Order of Installing Extension Blades
The order in which the station blades (GCD-8DLCA, GCD-16DLCA,
GPZ-8DLCB and GCD-4LCA, GCD-8LCA, GPZ-8LCE) are
physically inserted determines the numbering plan.
For example, when a digital station blade (GCD-16DLCA) is in Slot 1
(ext. 200~215) and three additional digital station blades are installed
in the following order,
the numbering plan below in
Table 4-1
Extension Blade Installation Order Example on page 4-5
applies.
After the initial powering up of the system, subsequent powering up
or resets do not change the slot identification. System programming
(Program 90-05) must be performed to change the slot identification.
Adding any daughter board to increase the available ports or go to a
higher capacity blade (e.g., GCD-16DLCA) may require that the slot
be deleted in programming and the blade reinstalled. In the following
example, to add a daughter board to slot 2, the blade must be
removed, deleted in Program 90-05-01, then reinstalled with the
daughter board attached, otherwise the additional ports are not
recognized. This however, uses new ports for the combined blade –
the initial ports (ports 17~24 using the example below) are not used.
Table 4-1 Extension Blade Installation Order Example
Order of
Installation
Blade Slot
Number
Blade
Extension
Numbers
1
1
GCD-16DLCA
200~215
2
2
GCD-16DLCA
216~231
3
4
GCD-8DLCA
GPZ-8LCE
232~247
4
3
GCD-8DLCA
248~263
To avoid unexpected extension/trunk numbering if
the VoIP or Voice Mail daughter board registers
with the system first, install these boards after the
other types of extension and trunk blades have
been installed.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...