![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970006.webp)
Issue 1.2
UNIVERGE SV9100
___________________________________________________________________________________
iv
Table of Contents
___________________________________________________________________________________
Section 4 Stand Mounting the Chassis .................................................... 3-41
4.1
Stand Mounting the 19” (CHS2UG) Chassis .............................3-41
4.1.1 CHS2UG Chassis Installation ..................................................3-41
4.1.2 Multiple CHS2UG Chassis Installation .....................................3-43
4.2
Stand Mounting the 9.5” CHS2UG B Chassis ...........................3-46
Section 5 Rack Mounting the Chassis ..................................................... 3-50
5.1
Rack Mounting the 19” (CHS2UG) Chassis ..............................3-50
Section 6 Battery Connection ................................................................... 3-53
6.1
Installing the Internal Batteries 19” (CHS2UG) Chassis ............3-53
6.2
Installing the External Batteries 19” (CHS2UG) Chassis ...........3-58
6.2.1 Floor Mounting the CHS LARGE BATT BOX ...........................3-58
6.2.2 Battery Installation ....................................................................3-60
6.2.3 CHS LARGE BATT BOX to CHS2UG Connection ..................3-64
6.2.4 CHS LARGE BATT BOX Fuse Replacement ..........................3-67
6.3
Installing the CHSGW SMALL BATT BOX on the 9.5” Chassis 3-70
6.3.1 CHSGW SMALL BATT BOX Installation ..................................3-70
6.3.2 CHSGW SMALL BATT BOX Fuse Replacement .....................3-76
6.4
Installing the External Batteries (CHS LARGE BATT BOX) to the 9.5”
Gateway (CHS2U GW) or Base (CHS2UG) Chassis 3-77
6.4.1 CHS LARGE BATT BOX Installation .......................................3-77
6.4.2 CHS LARGE BATT BOX to 9.5” Chassis Connection .............3-78
6.4.3 CHS LARGE BATT BOX Fuse Replacement ..........................3-79
Section 7 Power Supply ............................................................................ 3-79
Section 8 Remove and Install Cooling Fan .............................................. 3-79
8.1
CHS2UG Chassis ......................................................................3-79
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...